Decision Support Tool · 30 seconds

Turkey Technopark Net Cash Incentive Calculator — 30-Second Annual Estimate

Annual net cash incentive estimate from 5 inputs. 2026 statutory parameters (CBK 10803 5M fund threshold, Law 7566 SGK 9.875% net (non-mfg) / 8.375% (mfg), Law 7555 40× cap — applies to income-tax withholding + stamp duty only, Law 7524 Pillar Two QDMTT). Results are estimates; individual structuring requires advisory consultation.

What is a Technopark, and what does this tool compute?

A Technology Development Zone (Technopark) grants three core incentives to R&D and design activity. This tool estimates the annual cash impact of those three items side by side against a no-Technopark scenario:

  • Corporate tax exemption — R&D income in the zone is exempt from CT (exemption runs to 31/12/2028).
  • SGK employer-share support — Law 5746; half the employer share is funded by the Treasury (capped by the monthly PEK ceiling).
  • Income-tax withholding relief — R&D staff wage withholding is waived (after the minimum-wage exemption is deducted from tax).

3 pitfalls: 3% VC fund obligation (above the ₺5M threshold), mandatory CPA (YMM) certification (₺1M threshold), the 40× wage cap. Flagged automatically below based on your inputs.

Gross profit ratio on R&D earnings. Typical: 30-50%.
€750M+ means OECD Pillar Two QDMTT applies.